Before we begin: take a look at the processing of your personal data

If you visit a site that records cookies, a small text file will be created on your computer and stored in your browser. The next time you visit the same page, it will help you connect to the web faster. Our website will offer you relevant information and make it easier for you to work.

We mainly use cookies for anonymous traffic analysis and to improve our website. If you set your browser to block cookies, it is possible that the website will slow down and some parts of the website may not work completely correctly. More info on the processing of cookies.

For anonymous visitor analysis, third party tools are used that partly transfer data to the USA, where no equivalent data protection level as within the EU can be guaranteed. By clicking on "Allow all", you agree that cookies may be used also by these third-party providers.

thermal
Scroll to navigation

Incineration Zistersdorf - historical milestones

modellansicht-zistersdorf

Around € 90 bn investment, completion and beginning in May 2009.

Take a look at a flash presentation about the Waste-to-energy-plant in Zistersdorf, Austria.


First Incineration March 2009

img
  • reinforcement railway connection
  • blowing out boiler
  • first waste delivery
  • first waste charging
read more

Construction Progress December 2008

img
  • turbine
  • transformer
  • emergency power diesel engine
  • rapper
read more

Construction Progress September 2008

  • img_4685Fluegas Treatment
  • Bunker Emergency Suction
  • Boiler Downcomer
  • Boiler Horizontal Fluegas Section
read more

Construction Progress June 2008

  • fotoFeeding Water Reservoir
  • Reception Hall - Veneer
  • Oil-Separator, Water Bassin and Slag-Hall
  • Boiler Casing above Grid
read more

Construction Progress March 2008

  • fotoConstruction works for rail connection
  • Heavy erection incineration
  • Completion of concrete works for energy building /turbine house
  • Nature conservation with biotope
read more

Construction Progress December 2007

  • fotoAssembling of bunker top at 34m
  • Administration building, bunker and stair towers
  • Auxiliary boiler
  • Slag-hall south view
read more

Construction Progress September 2007

  • fotoAuxiliary boiler and Compressor building Slag-Hall in the background
  • Bunker at 21,5m
  • Start earthmoving for railway connection
  • Administration building – workshop...
read more

Structural part bunker

  • fotoConstruction of bunker walls in progress
  • Bunker floor casted
  • Armoring bunker in execution
  • Improvement of the soil finished
read more

Construction groundbreaking ceremony of the first .A.S.A. incinerator

mvanews3_pic1DI Dr Helmut Wurian, general manager of .A.S.A. Abfall Service Zistersdorf GmbH and representatives of policy and economy, started on the 25th of May with the ground breaking ceremony the construction of the incinerator Zistersdorf...

read more

Waste treatment with sophisticated technique

largeview1 Principle – Environmental compatibility, Reliability of operation, Easy of operation...

read more

Signing General Contract

schemaGeneral contract signing with Von Roll Umwelttechnik AG after negotiations lasting for months...

read more
10th anniversary WtE-Plant Zistersdorf - Full power ahead
27/02/2019

10th anniversary WtE-Plant Zistersdorf - Full power ahead

In March the WtE-Plant of FCC Zistersdorf celebrates its 10th anniversary.
FCC Austria takes care of cleanliness along A2 highway
01/08/2018

FCC Austria takes care of cleanliness along A2 highway

FCC Austria takes care of the waste and cleanliness for almost all service stations along the A2 highway.
New Service in Austria: Cleaning of Drainage Systems in Railroad Tunnels
22/07/2016

New Service in Austria: Cleaning of Drainage Systems in Railroad Tunnels

FCC Environment CEE (.A.S.A) offers a new service for cleaning drainage systems in railroad tunnels.
Resources for art: .A.S.A. Dress supports Billi Thanner‘s exhibition „Der Faden zieht sich durch“
17/06/2016

Resources for art: .A.S.A. Dress supports Billi Thanner‘s exhibition „Der Faden zieht sich durch“

FCC Environment CEE supports the current exhibition of the Austrian artist Billi Thanner with .A.S.A. Dress second...
„Well dressed“ doesn’t have to be expensive: .A.S.A. Dress creates greater value with Volkshilfe SÖB
17/06/2016

„Well dressed“ doesn’t have to be expensive: .A.S.A. Dress creates greater value with Volkshilfe SÖB

FCC Environment CEE delivers „.A.S.A. Dress" to Volkshilfe added-value-shop with its high class, affordable second...
“Local Tradition second hand” for a good purpose
09/10/2015

“Local Tradition second hand” for a good purpose

.A.S.A. Abfall Service donates nearly new second hand traditional folk costumes to the Viennese Caritas "carla" shops.

Why with us

  • All for one:

    We provide broad general waste solutions for the municipal, industrial, commercial and retail sectors as well as for domestic households.

  • Service for the Future:

    The long-term business relationships are founded on mutual trust and cooperation, loyalty and reliability, transparency and quality. We feel obliged to our customers and the environment – economy and ecology are therefore one and the same.

  • Professional and trustworthy:

    Due to our long-termexperience in the section waste-management, we can provide a straightforward, trustworthy, professional and environmentally friendly waste-management.

  • Modern plants and equipment:

    A modern waste-to-energy-plant, 3 sorting plants, 2 landfill sites, more than 200 trucks and special vehicles and more than 220.000 collection-/transport-containers and bins guarantee a professional waste-disposal and waste-treatment.

Plants and equipment

More than 200 trucks/special vehicles

More than 220.000 collection/transport containers

1 waste-to-energy-plant 

3 sorting plants

3 automatic splitting plants

1 mechanical / biological treatment plant

1 chemical / physical treatment plant

2 treatment plant for residue-derived fuels (RDF)

2 landfill sites

Did you know?
Over 1.250 trucks and special vehicles
Did you know?
Over 1,300.000 Containers and bins
Did you know?
Over 92 collection yards
Did you know?
17 transfer stations
Did you know?
28 sorting plants
Did you know?
12 RDF (alternative fuels treatment) and/or splitting plants
Did you know?
3 mechanical biological treatment plants
Did you know?
19 composting, solidification and biodegradation plants
Did you know?
28 landfills
Did you know?
1 waste-to-energy-plant for household and commercial waste
Did you know?
5,1 mil residents served
Did you know?
more than 576.000 t/a SRM handled
Did you know?
200 GWh/a by our W2E plants and cogeneration units
Did you know?
4.443 km streets cleaned
Did you know?
2.000 ha green areas maintained
Did you know?
more than 36.500 industrial clients served